China Petroleum Engineering & Construction Corporation – Techno (Pvt) Ltd. Consortium
Project Duration
23 months
Design Endorsement by
PENSPEN, UK
Pipeline Route/Length
Karachi to Mahmoodkot – 786 kms
Pipeline Size
26” diameter telescopic
Pipeline Capacity
Up to 8 million tons/year, can be increased to 12 million tons / year if required, to cater to the requirements of the future
Primary Thruput
High Speed Diesel Oil (HSD)
Korangi – Port Qasim Link Pipeline (KPLP)
The 22-kilometer long, 26" dia was commissioned in March, 2006. This tactical link has connected both the Karachi ports (Keamari & Port Qasim) through PARCO's Keamari-Korangi pipeline, providing flexibility in pipeline operations to receive crude as well as product from either port.