KEY PROJECT INFORMATION

  • EPC Agreement Signed
    August 7, 2001
  • EPC Contractor
    China Petroleum Engineering & Construction Corporation – Techno (Pvt) Ltd. Consortium
  • Project Duration
    23 months
  • Design Endorsement by
    PENSPEN, UK
  • Pipeline Route/Length
    Karachi to Mahmoodkot – 786 kms
  • Pipeline Size
    26” diameter telescopic
  • Pipeline Capacity
    Up to 8 million tons/year, can be increased to 12 million tons / year if required, to cater to the requirements of the future
  • Primary Thruput
    High Speed Diesel Oil (HSD)
  • Korangi – Port Qasim Link Pipeline (KPLP)
    The 22-kilometer long, 26" dia was commissioned in March, 2006. This tactical link has connected both the Karachi ports (Keamari & Port Qasim) through PARCO's Keamari-Korangi pipeline, providing flexibility in pipeline operations to receive crude as well as product from either port.